Codeofchina.com is in charge of this English translation. In case of any doubt about the English translation, the Chinese original shall be considered authoritative.
According to the requirements of Document JIANBIAO [2012] No.5 issued by the Ministry of Housing and Urban-Rural Development of the People's Republic of China - Notice on printing and distributing the development and revision plan on engineering construction standards and codes in 2012, the drafting group of Standard for building water supply and drainage has revised this standard through extensive investigation and study, careful summarization of practical experience and reference to relevant international and foreign advanced standards and on the basis of widely soliciting for opinions.
The main technical contents of this standard are general provisions, terms and symbols, water supply, sanitary wastewater, rain drainage, hot water and drinking water supply, etc.
The main technical contents revised in this standard are: 1. the average daily rated domestic water consumption for residential and public buildings is supplemented; 2. the dormitory classification and maximum daily hourly variation coefficient are adjusted; 3. the calculation method for the diameter of header pipe for the outdoor water supply in sub-district is adjusted; 4. the provisions on the calculation of design peak flow of water main of the building complex or the different functional parts of the same building are added; 5. the provisions on bottled liquid chlorine disinfection used for swimming pools and aquatic recreation pools are deleted; 6. the provisions on vacuum drainage are deleted; 7. the provisions on ozone disinfection safety for swimming pools and aquatic recreation pools are added; 8. the provisions of arranging grilling covers for water inlet, pool bottom water outlet and drain opening of swimming pools and aquatic recreation pools as well as those on the velocity of water flow passing the grilling are added; 9. the discharging capacity of floor drain is supplemented; 10. the maximum design drainage capacity of the vertical pipe for sanitary wastewater is adjusted; 11. the load of the drainage piping discharging separately without ventilation has been modified; 12. the conditions for setting the air admittance valve in the case that the drainage stack of public buildings is not extended to top for venting are added; 13. the provisions on the minimum width and depth of roof gutter (catchwater channel) are supplemented; 14. the provisions on the maximum design discharge flow of the roof drain and the piping design calculation are separately made for the roof rainwater according to single bucket system, gravity flow multi-bucket system and full pipe pressure flow multi-bucket system; 15. the requirements of sponge city for rainwater design for building and sub-district are added; 16. the calculation of design duration of rainfall of rainwater piping in sub-district is modified according to the current national standard GB 50014 Code for design of outdoor wastewater engineering; 17. the relevant requirements for setting rainwater detention tank in sub-district are supplemented; 18. the provisions on setting sterilization facilities for centralized hot water supply system are added; 19. the technical measures to ensure the effect of the circulation system of centralized hot water supply system are added; 20. the traditional storage type heat exchanger with low efficiency is eliminated and the half storage type heat exchanger with superior performance is recommended; 21. the contents regarding solar heat pump hot water supply system are added; 22. the provisions on various parameters for calculating the total area of solar thermal collector are supplemented; 23. the provisions on the selection of solar hot water system for different types of buildings under different conditions are added; 24. the range of heat loss values for distribution pipes is revised; 25. the flow calculation formula of circulating pump is revised; 26. the provisions on calculating the flow of the hot water supply pump and circulating pump of hot water storage tank are added.
The provisions printed in bold type in this standard are compulsory and must be enforced strictly.
Ministry of Housing and Urban-Rural Development is in charge of the administration of this standard and the explanation of the compulsory provisions, Shanghai Municipal Commission of Housing and Urban-Rural Development is responsible for the specific administration, and Arcplus Group PLC is responsible for the explanation of the specific technical contents. In case of any comment or suggestion during the process of implementing this standard, please send it to Arcplus Group PLC (address: National Standard Standard for design of building water supply and drainage Management Group, No.18, Lane 600, Nanchezhan Road, Shanghai; postal Code: 200011; email: GB50015_2019@163.com).
Standard for design of building water supply and drainage
1 General provisions
1.0.1 This standard is developed in order to ensure the design quality of building water supply and drainage engineering and meet the basic requirements of safety, sanitation, applicability, economy and green.
1.0.2 This standard is applicable to the design of domestic water supply and drainage engineering in civil buildings, industrial buildings and sub-districts and the design of rainwater drainage engineering in sub-districts.
1.0.3 Where the height of the building exceeds 250m, the design of water supply and drainage system of the building shall meet the provisions of this standard, for which special research and demonstration shall be carried out.
1.0.4 The building water supply and drainage design shall not only meet the use requirements, but also provide convenient conditions for construction and installation, operation management, maintenance and check, and safety protection.
1.0.5 For the design of building water supply and drainage engineering, this standard shall be implemented and the requirements of current relevant standards of the nation shall be met.
2 Terms and symbols
2.1 Terms
2.1.1
drinking water
domestic water with its quality meeting the requirements for daily drinking, washing, etc. specified in national standards for drinking water quality
2.1.2
non-drinking water
water, other than drinking water, used for flushing toilets, washing cars, sprinkling roads, watering and afforesting, and supplementing air conditioning circulating water and landscape water
2.1.3
secondary water supply
water supply mode in which water is supplied to users or used by oneself through facilities for storage, pressurization, etc. when the demand of civil and industrial buildings on drinking water pressure and volume exceeds the capability of the water supply network of public or self-constructed water supply facilities
2.1.4
hourly variation coefficient
ratio of maximum hourly water consumption to average hourly water consumption
2.1.5
maximum hourly water consumption
hourly water consumption during the maximum daily water consumption period
2.1.6
average hourly water consumption
average hourly water consumption during the maximum daily water consumption period
2.1.7
backflow pollution
pollution of domestic water supply system caused by back-pressure back flow or siphonage back flow
2.1.8
back-pressure back flow
backflow caused by the change of downstream pressure of the water supply system which causes the water pressure at the water use end to be higher than that at the water supply end
2.1.9
siphonage back flow
backflow of water or liquid mixture from plumbing fixtures or water receiver to domestic water supply system caused by the negative pressure in the water supply piping
2.1.10
air gap
the vertical spatial distance between the lowest point of the outlet of the pipeline or tap outlet and the overflow level of the water equipment in the case of a water supply system or the vertical spatial distance between the lowest point of the building drain opening of an indirect drainage equipment or container and the overflow level of the water receiver in the case of a drainage system
2.1.11
flood-level rim
overflow upper edge of fixtures
2.1.12
backflow preventer
device consisting of non-return components that can prevent the water flow in the water supply piping from flowing back
2.1.13
vacuum breaker
device that is able to introduce atmospheric pressure into the water supply piping to avoid backflow of water in such water supply piping due to siphonage
2.1.14
service pipe
pipe section connecting the municipal piping to the water supply network in sub-district, or pipe section introducing the water supply inter-building pipe in sub-district into the building
2.1.15
inter-building pipe
water supply and drainage piping arranged around the building and directly connected with the building service pipe and building drain
2.1.16
inlet pipe
domestic water supply pipe section from the water supply system to each household
2.1.17
vertical division zone
several water supply zones divided on the building water supply system along its vertical height
2.1.18
parallel water supply
water supply mode with each vertical water supply division zone of building having an independent pressurization (depressurization) system
2.1.19
series water supply
water supply mode with each vertical water supply division zone of building pressurizing (depressurizing) in a cascade stage manner
2.1.20
pressure superposed water supply
water supply mode with the water supply equipment directly absorbing water from a pressurized water supply network for pressurizing
2.1.21
exposed installation
method of laying the indoor piping in an exposed manner
2.1.22
concealed installation, embedded installation
method of installing the indoor piping in wall pipe chase, piping shaft or pipe ditch or concealing it by architectural decorations
2.1.23
manifold
pipe fittings for multi-branch pipeline
2.1.24
self-provided water source
water sources other than drinking water provided by urban water supply network
2.1.25
plumbing fixture, fixture
container or device that supplies water and receives and discharges sewage and waste water or dirt
GB 50015-2019 Standard for design of building water supply and drainage English
Foreword ii
1 General provisions
2 Terms and symbols
2.1 Terms
2.2 Symbols
3 Water supply
3.1 General requirements
3.2 Rated water consumption and water pressure
3.3 Water quality and contamination prevention
3.4 System selections
3.5 Pipes, appurtenances and water meters
3.6 Piping layout and installation
3.7 Design flow and pipe hydraulic calculation
3.8 Water tanks and reservoirs
3.9 Pressurizing equipment and pump house
3.10 Swimming pools and aquatic recreation pools
3.11 Circulating cooling water and cooling towers
3.12 Waterscape
3.13 Outdoor water supply in sub-district
4 Sanitary wastewater
4.1 General requirements
4.2 Drainage systems selection
4.3 Plumbing fixtures, floor drains and traps
4.4 Piping layout and installation
4.5 Hydraulic calculation of drainage piping
4.6 Pipes, fittings
4.7 Vent pipes
4.8 Sewage pumps and sump
4.9 Small sanitary waste treatment
4.10 Sanitary wastewater in sub-district
5 Rain drainage
5.1 General requirements
5.2 Building rainwater
5.3 Outdoor rainwater in sub-district
6 Hot water and drinking water supply
6.1 General requirements
6.2 Rated consumption, temperature and hot water quality
6.3 Hot water supply systems selections
6.4 Calculation of heat consumption, hot water consumption and heat supply of heating equipment
6.5 Water heating and storage
6.6 Hot water supply systems of solar and heat pump
6.7 Calculation for hot water pipe net
6.8 Pips, appurtenances and piping installation
6.9 Drinking water supply
Annex A Hazard degree of backflow & the selection of backflow prevention facilities
Annex B Values of coefficient αc in the formula for calculating simultaneous outflow probability of water supply fixture unit in the water supply pipe section
Annex C Calculation of design peak flow of water supply pipe section
Annex D Equivalent length for friction loss of valves and threaded fittings
Annex E Minimum clearance between underground pipelines (structures) for sub-districts
Annex F Calculation for the discharge volume of roof rainwater overflow facilities
Annex G Maximum design discharge capacity of vertical pipes for gravity flow system
Annex H Distribution of solar energy resources in China and their corresponding characteristics
Annex J Calculation of the number of drinking water taps for simultaneous use
Explanation of wording in this standard
List of quoted standards
1 總 則
1.0.1 為保證建筑給水排水工程設計質量,滿足安全、衛生、適用、經濟、綠色等基本要求,制定本標準。
1.0.2 本標準適用于民用建筑、工業建筑與小區的生活給水排水以及小區的雨水排水工程設計。
1.0.3 當建筑物高度超過250m時,建筑給水排水系統設計除應符合本標準的規定外,尚應進行專題研究、論證。
1.0.4 建筑給水排水設計,在滿足使用要求的同時還應為施工安裝、操作管理、維修檢測以及安全防護等提供便利條件。
1.0.5 建筑給水排水工程設計,除應執行本標準外,尚應符合國家現行有關標準的規定。
2術語和符號
2.1 術 語
2.1.1生活飲用水drinking water
水質符合國家生活飲用水衛生標準的用于日常飲用、洗滌等生活用水。
2.1.2生活雜用水 non-drinking water
用于沖廁、洗車、澆灑道路、澆灌綠化、補充空調循環用水及景觀水體等的非生活飲用水。
2.1.3 二次供水 secondary water supply
當民用與工業建筑生活飲用水對水壓、水量的要求超出城鎮公共供水或自建設施供水管網能力時,通過儲存、加壓等設施經管道供給用戶或自用的供水方式。
2.1.4小時變化系數hourly variation coefficient
最大時用水量與平均時用水量的比值。
2.1.5最大時用水量 maximum hourly water consumption
最高日最大用水時段內的小時用水量。
2.1.6平均時用水量 average hourly water consumption
最高日用水時段內的平均小時用水量。
2.1.7 回流污染 backflow pollution
由背壓回流或虹吸回流對生活給水系統造成的污染。
2.1.8 背壓回流 back-pressure back flow
因給水系統下游壓力的變化,用水端的水壓高于供水端的水壓而引起的回流現象。
2.1.9 虹吸回流 siphonage back flow
給水管道內負壓引起衛生器具、受水容器中的水或液體混合物倒流入生活給水系統的回流現象。
2.1.10 空氣間隙 air gap
在給水系統中,管道出水口或水嘴出口的最低點與用水設備溢流水位間的垂直空間距離;在排水系統中,間接排水的設備或容器的排出管口最低點與受水器溢流水位間的垂直空間距離。
2.1.11 溢流邊緣 flood-level rim
器具溢流的上邊緣。
2.1.12 倒流防止器 backflow preventer
采用止回部件組成的可防止給水管道水流倒流的裝置。
2.1.13 真空破壞器 vacuum breaker
可導入大氣壓消除給水管道內水流因虹吸而倒流的裝置。
2.1.14引入管 service pipe
由市政管道引入至小區給水管網的管段,或由小區給水接戶管引入建筑物的管段。
2.1.15 接戶管 inter-building pipe
布置在建筑物周圍,直接與建筑物引入管或排出管相接的給水排水管道。
2.1.16 入戶管(進戶管) inlet pipe
從給水系統單獨供至每個住戶的生活給水管段。
2.1.17 豎向分區 vertical division zone
建筑給水系統中在垂直高度分成若干供水區。
2.1.18 并聯供水parallel water supply
建筑物各豎向給水分區有獨立增(減)壓系統供水的方式。
2.1.19 串聯供水 series water supply
建筑物各豎向給水分區逐區串級增(減)壓供水的方式。
2.1.20疊壓供水pressure superposed water supply
供水設備從有壓的供水管網中直接吸水增壓的供水方式。
2.1.21 明設 exposed installation
室內管道明露布置的方法。
2.1.22 暗設 concealed installation,embedded installation
室內管道布置在墻體管槽、管道井或管溝等內,或者由建筑裝飾隱蔽的敷設方法。
2.1.23 分水器 manifold
用于多分支管路的管道配件。
2.1.24 自備水源 self-provided water source
除城鎮給水管網提供的生活飲用水之外的水源。
2.1.25 衛生器具plumbing fixture,fixture
供水并接受、排出污廢水或污物的容器或裝置。
2.1.26 衛生器具當量 fixture unit
以某一衛生器具流量(給水流量或排水流量)值為基數,其他衛生器具的流量(給水流量或排水流量)值與其的比值。
2.1.27額定流量 nominal flow
衛生器具配水出口在規定的工作壓力下單位時間內流出的水量。
2.1.28設計秒流量design peak flow
在建筑生活給水管道系統設計時,按其供水的衛生器具給水當量、使用人數、用水規律在高峰用水時段的最大瞬時給水流量作為該管段的設計流量,稱為給水設計秒流量,其計量單位通常以L/s表示。
建筑內部在排水管道設計時,按其接納室內衛生器具數量、排水當量、排水規律在排水管段中產生的瞬時最大排水流量作為該管段設計流量,稱為排水設計秒流量,其計量單位通常以L/s表示。
2.1.29水頭損失head loss
水通過管渠、設備、構筑物等引起的能耗。
2.1.30氣壓給水pneumatic water supply
由水泵和壓力罐以及一些附件組成,水泵將水壓入壓力罐,依靠罐內的壓縮空氣壓力,自動調節供水流量和保持供水壓力的供水方式。
2.1.31配水點points of distribution
給水系統中的用水點。
2.1.32循環周期 circulating period
循環水系統構筑物和管道內的有效水容積與單位時間內循環量的比值。
2.1.33 反沖洗 backwash
當濾料層截污到一定程度時,用較強的水流逆向對濾料進行沖洗。
2.1.34水質穩定處理 stabilization treatment of water qual-ity
為保持循環冷卻水中的碳酸鈣和二氧化碳的濃度達到平衡狀態(既不產生碳酸鈣沉淀而結垢,也不因其溶解而腐蝕),并抑制微生物生長而采用的水處理工藝。
2.1.35 濃縮倍數 cycle of concentration
循環冷卻水的含鹽濃度與補充水的含鹽濃度的比值。
2.1.36 自灌 self-priming
水泵啟動時水靠重力充入泵體的引水方式。
2.1.37 水景 waterscape,fountain
人工建造的水體景觀。
2.1.38親水性水景hydrophilic waterscape
產生飄粒、水霧會接觸器官吸入人體的動態水景。
2.1.39 生活污水domestic sewage
人們日常生活中排泄的糞便污水。
2.1.40生活廢水domestic wastewater
人們日常生活中排出的洗滌水。
2.1.41 生活排水 sanitary wastewater
人們在日常生活中排出的生活污水和生活廢水的總稱。
2.1.42 排出管 building drain,outlet pipe
從建筑物內至室外檢查井或排水溝渠的排水橫管段。
2.1.43 立管 vertical pipe,riser,stack
呈垂直或與垂線夾角小于45°的給水排水管道。
2.1.44 橫管horizontal pipe
呈水平或與水平線夾角小于45°的管道。其中連接器具排水管至排水立管的管段稱橫支管,連接若干根排水立管至排出管的管段稱橫干管。
2.1.45器具排水管 fixture drainage
自衛生器具存水彎出口至排水橫支管連接處之間排水管段。
2.1.46 清掃口 cleanout
排水橫管上用于清通排水管的配件。
2.1.47 檢查口 check hole,check pipe
帶有可開啟檢查蓋的配件,裝設在排水立管上,做檢查和清通之用。
2.1.48 存水彎trap
在衛生器具內部或器具排出口上設置的一種內有水封的配件。
2.1.49 水封 water seal
器具或管段內有一定高度的水柱,防止排水管系統中氣體竄入室內。
2.1.50 H管 H pipe
連接排水立管與通氣立管形如H的專用配件。
2.1.51 吸氣閥 air admittance valves
只允許空氣進入排水系統,不允許排水系統中臭氣逸出的通氣管道附件。
2.1.52 通氣管 vent pipe,vent
為使排水系統內空氣流通、壓力穩定、防止水封破壞而設置的與大氣相通的管道。
2.1.53伸頂通氣管 stack vent
排水立管與最上層排水橫支管連接處向上延伸至室外通氣的管段。
2.1.54專用通氣立管 specific vent stack
僅與排水立管連接,為排水立管內空氣流通而設置的垂直通氣管道。
2.1.55 匯合通氣管 vent headers
連接數根通氣立管或排水立管頂端通氣部分,并延伸至室外接通大氣的通氣管段。
2.1.56 主通氣立管 main vent stack
設置在排水立管同側,連接環形通氣管和排水立管,為排水橫支管和排水立管內空氣流通而設置的垂直管道。
2.1.57 副通氣立管 secondary vent stack,assistant vent stack
設置在排水立管不同側,僅與環形通氣管連接,為使排水橫支管內空氣流通而設置的通氣立管。
2.1.58環形通氣管loop vent
從多個衛生器具的排水橫支管上最始端的兩個衛生器具之間接出至主通氣立管或副通氣立管的通氣管段,或連接器具通氣管至主通氣立管或副通氣立管的通氣管段。
2.1.59器具通氣管 fixture vent
衛生器具存水彎出口端接至環形通氣管的管段。
2.1.60結合通氣管 yoke vent
排水立管與通氣立管的連接管段。
2.1.61 自循環通氣 self-circulation venting
通氣立管在頂端、層間和排水立管相連,在底端與排出管連接,排水時在管道內產生的正負壓通過連接的通氣管道迂回補氣而達到平衡的通氣方式。
2.1.62間接排水 indirect drain
設備或容器的排水管道與排水系統非直接連接,其間留有空氣間隙。
2.1.63 同層排水 same-floor drainage
排水橫支管布置在本層,器具排水管不穿樓層的排水方式。
2.1.64覆土深度 covered depth
埋地管道管外頂至地表面的垂直距離。
2.1.65 埋設深度 buried depth
埋地排水管道內底至地表面的垂直距離。
2.1.66水流轉角 angle of turning flow
水流原來的流向與其改變后的流向之間的夾角。
2.1.67充滿度depth ratio
水流在管渠中的充滿程度,管道以水深與管徑之比值表示,渠道以水深與渠高之比值表示。
2.1.68 隔油池 grease tank
分隔、攔集生活廢水中油脂的小型處理構筑物。
2.1.69 隔油器 grease interceptor
分隔、攔集生活廢水中油脂的成品裝置。
2.1.70降溫池 cooling tank
降低排水溫度的小型處理構筑物。
2.1.71 化糞池 septic tank
將生活污水分格沉淀,并對污泥進行厭氧消化的小型處理構筑物。
2.1.72 中水 reclaimed water
各種生活排水經處理達到規定的水質標準后回用的水。
2.1.73醫療機構污水 medical orgnization sewage
醫療機構門診、病房、手術室、各類檢驗室、病理解剖室、放射室、洗衣房、太平間等處排出的診療、生活及糞便污水。
2.1.74污水提升裝置 sewage lifting device
集污水泵、集水箱、管道、閥門、液位計和電氣控制為一體,用于污水提升的成品裝置。
2.1.75 換氣次數time of air change
通風系統單位時間內送風或排風體積與室內空間體積之比。
2.1.76 暴雨強度 rainfall intensity
單位時間內的降雨量。工程上常用單位時間內單位面積上的降雨體積計,其計量單位通常以L/(s·hm2)表示。
2.1.77 重現期 recurrence interval
經一定時間的雨量觀測資料統計分析,大于或等于某暴雨強度的降雨出現一次的平均間隔時間,其單位通常以a表示。
2.1.78 降雨歷時duration of rainfall
降雨過程中的任意連續時段。
2.1.79 地面集水時間 inlet time
雨水從相應匯水面積的最遠點地表徑流到雨水管渠入口的時間,簡稱集水時間。
2.1.80 管內流行時間time of flow
雨水在管渠中流行的時間,簡稱流行時間。
2.1.81匯水面積 catchment area
雨水管渠匯集降雨的面積。
2.1.82重力流雨水排水系統 gravity rain drainage system
管道按重力無壓流設計的屋面雨水排水系統。
2.1.83 滿管壓力流雨水排水系統 full pressure storm sys-tem
管道按滿管流產生的負壓抽吸排水設計的屋面雨水排水系統。
2.1.84 雨水口 gulley,gutter inlet
將地面雨水導入雨水管渠的帶格柵的集水口。
2.1.85 線性排水溝linear drainage ditch
將地面雨水沿程連續收集的排水溝。
2.1.86雨落水管downspout,leader
敷設在建筑物外墻的外側,用于排除屋面雨水的排水立管。
2.1.87 懸吊管hung pipe
懸吊在屋架、樓板和梁下或架空在柱上的雨水橫管。
2.1.88 雨水斗 roof drain
將建筑物屋面的雨水導入雨水立管的裝置。
2.1.89 徑流系數 runoff coefficient
一定匯水面積的徑流雨水量與降雨量的比值。
2.1.90集中熱水供應系統 central hot water supply system
供給一幢(不含單幢別墅)、數幢建筑或供給多功能單棟建筑中一個、多個功能部門所需熱水的系統。
2.1.91 全日集中熱水供應系統 all day hot water supply system
在全日、工作班或營業時間內不間斷供應熱水的系統。
2.1.92 定時集中熱水供應系統 fixed time hot water supply system
在全日、工作班或營業時間內某一時段供應熱水的系統。
2.1.93 局部熱水供應系統local hot water supply system
供給單棟別墅、住宅的單個住戶、公共建筑的單個衛生間、單個廚房餐廳或淋浴間等用房熱水的系統。
2.1.94開式熱水供應系統 open hot water supply system
熱水管系與大氣相通的熱水供應系統。
2.1.95閉式熱水供應系統 closed hot water supply system
熱水管系不與大氣相通的熱水供應系統。
2.1.96 單管熱水供應系統 single line hot water system,tempered water supply system
用一根管道直接供應配水點所需使用溫度熱水的熱水供應系統。
2.1.97 熱泵熱水供應系統heat pump hot wat er supply sys-tem
采用熱泵機組制備和供應熱水的熱水供應系統。
2.1.98 水源熱泵 water-source heat pump
以水或添加防凍劑的水溶液為低溫熱源的熱泵。
2.1.99空氣源熱泵 air-source heat pump
以環境空氣為低溫熱源的熱泵。
2.1.100 熱源heat source
制取熱水或熱媒的能源。
2.1.101 熱媒heat medium
熱傳遞載體,常為熱水、蒸汽、煙氣。
2.1.102 廢熱 waste heat
生產過程中排放的廢棄熱量,如廢蒸汽、高溫廢水(液)、高溫煙氣等排放的熱量。
2.1.103 太陽能保證率 solar fraction
系統中全年由太陽能提供的熱量占全年系統總耗熱量的比率。
2.1.104太陽輻照量 solar irradiation
接收到太陽輻射能的面密度。
2.1.105燃油(氣)熱水機組 fuel oil(gas)hot water device
由燃燒器、水加熱爐體和燃油(氣)供應系統等組成的設備組合體,爐體水套與大氣相通,呈常壓狀態。
2.1.106設計小時耗熱量design heat consumption of maxi-mum hour
熱水供應系統中用水設備、器具最大用水時段內的小時耗熱量。
2.1.107 設計小時供熱量design heat supply of maximum hour
熱水供應系統中水加熱設備最大用水時段內的小時產熱量。
2.1.108 同程熱水供應系統 reversed return hot water sys-tem
對應每個配水點的供水與回水管路長度之和相等或近似相等的熱水供應系統。
2.1.109第一循環系統heat carrier circulation system
集中熱水供應系統中,熱水鍋爐或熱水機組與水加熱器或貯熱水罐之間組成的熱媒或熱水的循環系統。
2.1.110第二循環系統hot water circulation system
集中熱水供應系統中,水加熱器或貯熱水罐與熱水供、回水管道組成的熱水循環系統。
2.1.111 上行下給式downfeed system
給水橫干管位于配水管網的上部,通過立管向下給水的方式。
2.1.112下行上給式 upfeed system
給水橫干管位于配水管網的下部,通過立管向上給水的方式。
2.1.113 回水管 return pipe
在熱水循環管系中僅通過循環流量的管段。
2.1.114管道直飲水系統pipe system for fine drinking water
原水經深度凈化處理達到標準后,通過管道供給人們直接飲用的供水系統。
2.1.115 水質阻垢緩蝕處理 water quality treatment of scale inhibitor and corrosion-delay
采用電、磁、化學穩定劑等物理、化學方法穩定水中鈣、鎂離子,使其在一定的條件下不形成水垢,延緩對加熱設備或管道的腐蝕的水質處理。
2.1.116 太陽能熱水系統 solar hot water system
利用太陽能集熱器集取太陽能熱能為主熱源,配置輔助熱源制備并供給生活熱水的系統。
2.1.117 集中集熱集中供熱太陽能熱水系統 cent ralized heat collecting and centralized heat supplying solar hot water system
集中集取太陽能的熱能,集中配置輔助熱源的太陽能熱水系統。
2.1.118 集中集熱分散供熱太陽能熱水系統 centralized heat collecting and decentralized heat supplying solar hot water system
集中集取太陽能的熱能,分散配置輔助熱源的太陽能熱水系統。
2.1.119 分散集熱分散供熱太陽能熱水系統decentralized heat collecting and decent ralized heat supplying solar hot water system
分散集取太陽能的熱能,分散配置輔助熱源的太陽能熱水系統。
2.1.120 直接太陽能熱水系統 solar direct system
集取太陽能的熱能直接加熱冷水,配置輔助熱源供給生活熱水的太陽能熱水系統。
2.1.121 間接太陽能熱水系統 solar indirect system
集取太陽能的熱能加熱被加熱介質(軟化水或防凍液水)經水加熱設施間接加熱冷水,配置輔助熱源供給生活熱水的太陽能熱水系統。
2.1.122 開式太陽能集熱系統 open system
太陽能集熱器內被加熱介質(冷水、軟化水、防凍液水)直接通大氣的集熱系統。
2.1.123 閉式太陽能集熱系統 closed system
太陽能集熱器內被加熱介質(冷水、軟化水、防凍液水)不通大氣密閉承壓運行的集熱系統。
2.2 符 號
2.2.1 流量、流速:
qb——水泵出流量;
qbc——補充水水量;
qg——計算管段的給水設計秒流量;
qgo——同類型的一個衛生器具給水額定流量;
qgz——單位輪廓面積集熱器對應的工質流量;
qh——衛生器具熱水的小時用水定額;
qi——設計暴雨強度;
qL——最高日的用水定額;
qmax——計算管段上最大一個衛生器具的排水流量;
qmr——平均日熱水用水定額;
qn——每人每日計算污泥量;
qo——飲水水嘴額定流量;
qp——排水流量;
qpo——同一類型的一個衛生器具排水流量;
qr——熱水用水定額;
qrh——設計小時熱水量;
qrjd——集熱器單位輪廓面積平均每日產熱水量;
qw——每人每日計算污水量;
wx——循環流量;
qxh——循環水泵流量;
qy——設計雨水流量;
qyL——溢流量;
qz——冷卻塔蒸發損失水量;
v——一管道內的平均水流速度。
2.2.2水壓、水頭損失:
Hb——循環水泵揚程;
Hxr——第一循環管的自然壓力值;
he——集熱系統循環流量通過集熱水加熱器的阻力損失;
he1——循環流量通過熱泵冷凝器、快速水加熱器的阻力損失;
hf——附加壓力;
hj——集熱系統循環流量通過集熱器的阻力損失;
hjx——集熱系統循環流量通過循環管道的沿程與局部阻力損失;
hp——循環流量通過配水管網的水頭損失;
hx——循環流量通過回水管網的水頭損失;
hxh——循環流量通過循環管道的沿程與局部阻力損失;
hz——集熱器頂與貯熱水箱最低水位之間的幾何高差;
Δh——熱水鍋爐或水加熱器中心與貯熱水罐中心的標高差;
I——水力坡度;
i——管道單位長度的水頭損失;
P——壓力;
p1——膨脹罐處管內水壓力;
P2——膨脹罐處管內最大允許壓力;
R——水力半徑。
2.2.3 幾何特征:
A——設計充滿度時的過水斷面;
Ai——集熱器總面積;
Ajj——間接太陽能熱水系統集熱器總面積;
Ajz——直接太陽能熱水系統集熱器總面積;
byL——溢流孔寬度;
DyL——漏斗喇叭口直徑;
dj——管道計算內徑;
dyL——溢流管內徑;
Fjr——水加熱器的加熱面積;
Fw——匯水面積;
H1——熱水鍋爐、水加熱器底部至高位冷水箱面的高度;
h1——膨脹管高出高位冷水箱最高水位的垂直高度;
hy1——溢流水位高度;
hy2——天溝水位至管中心淹沒高度;
hy3——喇叭口上邊緣溢流水位深度;
V——容積;
V1——高溫貯熱水箱總容積;
V2一低溫供熱水箱總容積;
V3——貯熱、供熱合一的低溫熱水箱總容積;
V4——熱媒水貯熱水箱總容積;
Ve——膨脹罐的總容積;
Vn——化糞池污泥部分容積;
Vq——氣壓水罐總容積;
Vq1——氣壓水罐水容積;
Vq2——氣壓水罐的調節容積;
Vr——總貯熱容積;
Vrx——集熱水加熱器或集熱水箱(罐)有效容積;
Vrx1——集熱水箱有效容積;
Vrx2——分戶容積式熱水器的有效容積;
Vs——系統內熱水水總容積;
Vw——化糞池污水部分容積。
2.2.4 計算系數:
bf——化糞池實際使用人數占總人數的百分數;
bg——衛生器具同時給水百分數;
bj——集熱器面積補償系數;
bn——濃縮后污泥含水率;
bp——衛生器具同時排水百分數;
bx——新鮮污泥含水率;
Ch——海澄一威廉系數;
Cr——熱水供應系數的熱損失系數;
f——太陽能保證率;
g——重力加速度;
K——傳熱系數;
Kh——小時變化系數;
Kx——相應循環措施的附加系數;
k1——用水均勻性的安全系數;
k2——水溫差因素的附加系數;
Ms——污泥發酵后體積縮減系數;
Nn——濃縮倍數;
n——管道粗糙系數;
U——衛生器具給水當量的同時出流概率;
UL——集熱器熱損失系數;
Uo——最大用水時衛生器具給水當量平均出流概率;
——給水干管的衛生器具給水當量平均出流概率;
ψ——徑流系數;
α——根據建筑物用途而定的系數;
α1——水嘴同時使用經驗系數;
αa——氣壓水罐的調節容積安全系數;
αb——氣壓水罐工作壓力比;
αc——對應Uo的系數;
β——氣壓水罐的容積系數;
σ——溢流水流斷面面積與天溝斷面面積之比;
ε——水垢和熱媒分布不均勻影響傳熱效率的系數;
η——有效貯熱容積系數;
η1——集熱系統的熱損失;
ηj——集熱器總面積的年平均集熱效率。
2.2.5 熱量、溫度、比重和時間:
C——水的比熱;
Jt——集熱器總面積的年平均日太陽輻照量;
QR——設計小時供熱量;
Qh——設計小時耗熱量;
Qmd——平均日耗熱量;
Qrh——設計小時熱水量;
Qs——配水管道的熱損失;
T——用水時數;
T1——設計小時耗熱量持續時間;
T2——高溫熱水貯水時間;
T3——低溫熱水貯水時間;
T4——低谷電加熱的時間;
T5——熱泵機組設計工作時間;
t——降雨歷時;
t1——地面集流時間;
t2——管渠內雨水流行時間;
tc——被加熱水初溫;
th——貯水溫度;
t1——冷水溫度;
tmc——熱媒初溫;
tmz——熱媒終溫;
tn——污泥清掏周期;
tr——熱水溫度;
tr1——使用溫度;
tr2——設計熱水溫度;
tw——污水在化糞池中停留時間;
tz——被加熱水終溫;
tLm——年平均冷水溫度;
Δt——快速水加熱器兩側的熱媒進水、出水溫差或熱水進水、出水溫差;
Δtj——熱媒與被加熱水的計算溫度差;
Δtmm——熱媒供回水平均溫度差;
Δtmax——熱媒與被加熱水在水加熱器一端的最大溫度差;
Δtmin——熱媒與被加熱水在水加熱器一端的最小溫度差;
Δts——配水管道的熱水溫度差;
ρf——加熱前加熱貯熱設備內的水的密度;
ρ1——冷水密度;
ρr——熱水密度。
2.2.6 其他:
b1——同日使用率;
M——電能轉為熱能的效率;
m——用水計算單位數;
m1——分散供熱用戶的個數;
mf——化糞池服務總人數;
N——電熱水機組功率;
NG——每戶設置的衛生器具給水當量數;
Ng——計算管段的衛生器具給水當量總數;
NP——計算管段的衛生器具排水當量總數;
no——同類型衛生器具數;
n1——飲水水嘴數量;
nq——水泵啟動次數。
3 給 水
3.1一般規定
3.1.1 建筑給水系統的設計應滿足生活用水對水質、水量、水壓、安全供水,以及消防給水的要求。
3.1.2 自備水源的供水管道嚴禁與城鎮給水管道直接連接。
3.1.3 中水、回用雨水等非生活飲用水管道嚴禁與生活飲用水管道連接。
3.1.4 生活飲用水應設有防止管道內產生虹吸回流、背壓回流等污染的措施。
3.1.5 在滿足使用要求與衛生安全的條件下,建筑給水系統應節水節能,系統運行的噪聲和振動等不得影響人們的正常工作和生活。
3.1.6 生活飲用水給水系統的涉水產品應符合現行國家標準《生活飲用水輸配水設備及防護材料的安全性評價標準》GB/T 17219的規定。
3.1.7 小區給水系統設計應綜合利用各種水資源,充分利用再生水、雨水等非傳統水源;優先采用循環和重復利用給水系統。
3.2 用水定額和水壓
3.2.1 住宅生活用水定額及小時變化系數,可根據住宅類別、建筑標準、衛生器具設置標準等因素按表3.2.1確定。